What Is a Data Center for a Federal Agency
OMB's M-25-03 defines which federal facilities count and what they must meet.

Federal data center compliance now centers on facility performance. OMB Memorandum M-25-03 implements binding cybersecurity, resiliency, and availability requirements under the Federal Data Center Enhancement Act (FDCEA). The shift comes as AI raises the need for computing and executive directives speed up the building of infrastructure. Agencies covered by the rules must meet the facility standards, while cloud AI services must go through a separate authorization process.
Which Facilities Count as Federal Data Centers
M-25-03, issued January 14, 2025 by Federal CIO Clare Martorana, sets thr`ee criteria that a facility must meet to count as a federal data center. A facility must be a persistent physical structure at a fixed location, house qualifying IT equipment, and actively host systems or data accessed by other systems or users. A location does not qualify merely because it contains equipment related to an agency’s IT operations.
The memo excludes spaces used solely for support infrastructure, including networking and telecommunications equipment, cabling, power distribution, print servers, or IoT devices. These exclusions are consistent with the FDCEA. Private cloud-only facilities also fall outside the boundary. The distinction is between facilities that host systems or data and spaces that only support computing, rather than between locations with and without an IT function.
How Ownership & Upgrades Affect Compliance
Within that boundary, the memo distinguishes agency-operated centers from contractor-operated centers. Agency-operated centers are those that a covered agency owns, runs, or maintains itself. Leased facilities fall within this category as well. So do facilities used under a General Services Administration occupancy agreement. The rules cover the agencies listed in 31 U.S. Code § 901(b), under the Chief Financial Officers (CFO) Act of 1990.
A separate classification turns on when a facility was established or changed. The memo classifies a center as “new” if it was established or substantially upgraded or expanded after January 14, 2025. Substantial changes reach beyond the computing equipment itself. They include changes to power supply or distribution, cooling, physical security, networking, IT equipment, or the size of the space hosting that equipment. Nextgov/FCW reports that agency-operated centers have one year from January 14, 2025 to meet the requirements, while contractor-operated centers have one year or until their contracts are renewed.
Infrastructure Inside a Federal Data Center
The Congressional Research Service describes a data center as a physical facility where large computer systems are housed and run. Federal facilities house servers, mainframes, high-performance computing devices, storage, and networking gear. This equipment requires active management of its environment. Power and cooling therefore form part of the operating context for the systems inside, rather than being separate from the facility’s computing role.
The Department of Energy reports that data centers consumed about 4.4% of total U.S. electricity in 2023. As the need for AI grows, commercial developers have built facilities the size of warehouses that house thousands of servers. M-25-03 requires agencies to use resource consumption metrics to manage energy use as part of running their facilities.
From Consolidation to Performance Requirements
The 2010 Federal Data Center Consolidation Initiative (FDCCI) was the first major federal effort to slow and then reverse largely unchecked growth in the number of data centers. The 2014 Federal Information Technology Acquisition Reform Act (FITARA) made the initiative part of the law and required consolidation and optimization. It also strengthened agency CIO authority over IT investments and acquisitions. By 2016, the federal government was estimated to have more than 10,000 data centers.
The Government Accountability Office records agency-reported cost savings and avoidances of over $6 billion from fiscal 2012 to 2021. When the consolidation provisions expired, Congress determined that their goals had been substantially achieved. The 2023 FDCEA, included in the National Defense Authorization Act for Fiscal Year 2024, directed OMB to establish minimum cybersecurity, resiliency, and availability requirements.
Private cloud-only facilities also fall outside the boundary.
Mandatory Security, Resiliency, & Availability Standards
M-25-03 names mandatory standards, including the Federal Information Security Modernization Act (FISMA) and NIST Special Publication 800-53 Rev. 5, Security and Privacy Controls for Information Systems and Organizations (2020). It also names ANSI/TIA-942, Telecommunications Infrastructure Standard for Data Centers, and the Uptime Institute Data Center Site Infrastructure Tier Standard, Topology. The requirements extend beyond information security controls alone. They bring data center infrastructure into the same compliance framework as the systems that facilities host.
For physical security, agencies must use the Interagency Security Committee risk management process to set requirements for both new facilities and those already in use. Responsibility sits in each agency’s CIO office, which holds centralized acquisition and management authority. OMB oversees compliance with the memo’s requirements. This allocation makes facility compliance an IT management obligation, rather than a question confined to the physical building.
How AI Expands Federal Computing Requirements
M-25-03 states that “advances in artificial intelligence (AI) capabilities and growing use of AI among agencies will further increase demand for high-performance computing provided by data centers”. A 2024 Department of Energy study projected data center electricity consumption rising from 176 TWh in 2023 to between 325 and 580 TWh by 2028. The range reflects uncertainty about the adoption of AI. It covers agency and other data center consumption, so it provides energy context for federal growth.
Federal AI workloads already include FOIA response drafting at over 4,000 requests per month at a mid-size agency. Case-management narrative generation accounts for over 25,000 updates per month across enforcement, eligibility, claims, or licensing functions. Other uses draw on agencies’ internal knowledge. They include internal policy Q&A using regulations, agency manuals, and historical decisions, as well as citizen-service triage and document pre-screening for procurement, OIG, or IG functions.
Executive Order 14318, issued July 23, 2025, defines an AI “Data Center Project” as a facility requiring greater than 100 MW of new load dedicated to AI inference, training, simulation, or synthetic data generation. General IT standards set the requirements for facilities covered by the rules, while AI raises how much power, cooling, and compute capacity they need.
FedRAMP Governs Cloud AI Authorization
FedRAMP is the standard process that grants security authorization to cloud services that support federal workloads, including AI services. For cloud AI, authorization serves as a procurement gate. That gate is separate from M-25-03 facility classification.
As of 2025, only 451 companies had achieved FedRAMP authorization. Initial costs range from $500K to $3M or more, and the traditional process takes 12 to 18 months. Authorization also entails costs after the initial process. Continuous monitoring adds $200K to $1M annually, with remediation timelines of 30 to 180 days depending on risk level. The FedRAMP 20x initiative is working to speed authorization for qualifying AI vendors.
FedRAMP’s 2025 AI Prioritization Initiative began in August 2025 and completed in April 2026. It prioritized conversational AI for federal workers’ routine, repeated use. Services needed single sign-on, SCIM provisioning, role-based access control, real-time analytics, and guaranteed data separation, plus demand from at least five CFO Act agencies or a CIO Council recommendation.
The June 11, 2025 announcement covered Claude 3.5 Sonnet v1 and Claude 3 Haiku for FedRAMP High and DoD Impact Level 4 and 5 workloads through Amazon Bedrock in AWS GovCloud (US) regions. Microsoft Azure OpenAI Service holds FedRAMP High approval for U.S. Government use and DoD IL4/IL5 clearance. Oracle AI Data Platform for US federal agencies became available on March 31, 2026 in OCI’s FedRAMP High-authorized Government Cloud, which has IL4 and IL5 support for sensitive and controlled unclassified information.
Accelerating Federal Data Center Infrastructure Development
The order, titled “Accelerating Federal Permitting of Data Center Infrastructure,” directs agencies to identify and expand categorical exclusions under the National Environmental Policy Act (NEPA). Its Qualifying Project definition provides several eligibility routes. A data center or covered component project can qualify through at least $500 million in committed capital expenditures or an incremental electric load addition greater than 100 MW. Projects can also qualify by protecting national security or through designation by the Secretary of Defense, Interior, Commerce, or Energy.
The order gave each agency involved 10 days to find categorical exclusions already in place that could help a Qualifying Project get built. The Council on Environmental Quality was directed to coordinate new exclusions for actions normally having no significant environmental effect. The AI Action Plan, announced the same day, includes “promoting rapid buildout of data centers”. The Department of Energy announced on July 24, 2025 that it had chosen four sites as part of its plans to invite private sector partners to build AI data centers and energy generation projects. Faster buildout complements M-25-03’s performance requirements.
Sources
- https://bidenwhitehouse.archives.gov/wp-content/uploads/2025/01/M-25-03_Implementation-Guidance-for-the-Federal-Data-Center-Enhancement-Act.pdf
Primary source for the M-25-03 facility definitions, exclusions, classifications, and mandatory standards.
- Accelerating Federal Permitting of Data Center Infrastructure
Source for the executive order's Data Center Project and Qualifying Project definitions and NEPA categorical exclusion directives.
- Data Center Energy Infrastructure: Federal Permit Requirements | Congress.gov | Library of Congress
Supplied the CRS description of data centers and the energy and permitting context.
- OMB releases last-minute data center guidance
Provided the compliance timelines for agency-operated and contractor-operated centers.
- https://whitehouse.gov/wp-content/uploads/2025/01/M-25-03_Implementation-Guidance-for-the-Federal-Data-Center-Enhancement-Act.pdf
Duplicate copy of the M-25-03 memo covering the same definitions and requirements.
- Data Center Energy Infrastructure: Federal Permit Requirements
PDF of the CRS report on data center energy infrastructure and federal permit requirements.
- https://www.gao.gov/assets/gao-23-105946.pdf
Supplied the GAO figure on over $6 billion in agency-reported consolidation savings and avoidances.
- https://www.energy.gov/articles/doe-announces-site-selection-ai-data-center-and-energy-infrastructure-development-federal
Source for DOE's July 2025 selection of four federal sites for AI data center development.